Rio Vista Park

Aqua Engineering, Inc. worked with Olsson Associates, the landscape architect and civil engineer to complete the design of the irrigation system, lake system, water features, and irrigation pump station at Rio Vista Park in Peoria, Arizona. The design work included grading plans, lake liner system, aeration system, pump circulation system, electrical controls, and irrigation pump station.

Design work was coordinated with the City of Peoria and the Arizona Game and Fish Department requirements to include the 2.5 acre lake in Arizona’s “Urban Fishing Program.” All systems installed were designed to support a fish population in addition to providing an aesthetic water feature for the park.

Final design resulted in a 750 GPM pump station with automatic filtration, multiple vertical turbine pumps and variable frequency drive control.

Comments