Fort Logan National Cemetery

Aqua Engineering prepared the irrigation and pumping system master plan, schematic design, design development, and construction documents for the 66-acre expansion. Additionally, renovation construction documents were prepared for areas that were disturbed including the administrative building, visitor’s center, main entrance, and committal shelters.

Renovations to the pumping systems included the expansion of a 2000 GPM pump station and the construction of a new 1200 GPM pump station. The existing central control system was also upgraded, and construction observation services were provided.

By investigating the existing raw water delivery system and local water rights, our engineers were able to help the Veterans Administration determine how much more water they need to irrigate the expanded site.

Comments