City of Evans Raw Water Master Plan

The City of Evans Raw Water Irrigation Master Plan project is a multi- phase project that is ongoing. A master plan was prepared which included preliminary design of several raw water pump stations, diversions, and pipe infrastructure. Design and construction documents were prepared for Evans Community Complex, Evans Waste Water Treatment Plant, and Riverside Park. Each system included a raw water pump station, plan and profile piping design, and fully automated irrigation systems.

The Master Plan report included a review of water rights, available water sources, recommended approaches and feasibility, economic analysis, and potential revenue.

Irrigation system design included turf areas and tree, shrub, and ground cover planting areas. Zone control valves and isolation gate valves permit isolation of sections for repairs or maintenance.